Strathaven Leisure Centre
Packaged Plantroom installation
Brief: The Project is for the provision of a new Packaged Plantroom facility for Strathaven Leisure Centre to replace the existing plant which had reached the end of its serviceable life. The provision of a packaged plantroom allowed the Leisure Centre to reclaim space that was previously occupied with old plant to put to new use. The Leisure Centre was to remain fully operational during the works, including plant changeover, which was successfully achieved.
Project Overview: This project started in April 2017 and was completed in October 2017.
Tasks: BPS Group undertook all Mechanical & Electrical Engineering works on this project. Works involved Heating, Water, Utility Alterations, Electrical, Spa Chemical, Building Management System & Fire Alarms. All works were carried out in a manner which allowed the Leisure Centre to remain operational, and with a seamless changeover from old plant to new. Redundant plant was removed from site, leaving the Centre with space for new use.