client project

Ultimate Group

Project Overview: BPS Group were engaged by Marshall Construction for the Mechanical & Electrical works for the creation of a new bespoke facility for the Ultimate Group in Stirling. 

BPS carried out the design and installation of Heating, Water Services, Ventilation and Lighting to meet the specific requirements of the client and their operations of Vehicle Preparation, Detailing & Storage. These included Radiant Heating & Low Level Lighting to Detailing Bays and Heat Recovery Ventilation to Paint Protection Film (PPF) Bays.

Main Contractor: Marshall Construction Ltd
Architects: Machin Dunn + MacFarlane
Consultant: RSP Consulting Engineers LLP

Contract Value: £275,000.00
Contract Period: 15 Weeks
Nature of Contract: Mechanical & Electrical Services

“BPS were meticulous in their approach to the design of the M&E services, working seamlessly with the design team and our Client to help realise the vision we had for this facility. The knowledge and advice given throughout the project was excellent while the final installation was exemplary.”